Together with our clients, Enersynt is actively working towards the energy transition. The below case studies detail a selection our projects. Feel free to reach out in case you would like to receive our complete reference list or if you would like to know more about a specific project.

BESS Harmignies
BESS Harmignies is a 76 MW / 300 MWh battery storage project that enhances stability and flexibility on the Belgian transmission grid. Enersynt supported Energy Solutions Group as Electrical Owner’s Engineer throughout design, construction, and commissioning.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Hyoffwind
Hyoffwind is set to become a 37 MVA hydrogen production facility situated in the port of Zeebrugge. Enersynt, acting as the lead electrical engineer on behalf of the developer, contributed to bringing this innovative project to the next stages of development.

Northwester 2
The Northwester 2 offshore wind farm is located in the North Sea, off the Belgian coast. The grid connection of the wind farm is realized through an offshore high voltage substation which is connected to Elia’s Offshore Switch Yard (OSY) to export the energy to shore.