Hyoffwind

Hyoffwind is set to become a 37 MVA hydrogen production facility situated in the port of Zeebrugge. Enersynt, acting as the lead electrical engineer on behalf of the developer, contributed to bringing this innovative project to the next stages of development.

Deux-Acren

Corsica Sole has developed a 50MW/100MWh battery energy storage system (BESS) in Belgium. Enersynt was entrusted with ensuring compliance with the Elia Type C grid code requirements for Storage Park Modules (SPMs).

Borealis Solar Carports

Type B grid compliance studies and model development for 3.3 MWp solar carports installed in the Beringen and Kallo manufacturing plants of Borealis.

Cordoba

The CORDOBA research project aimed to deepen academic and industry understanding and knowledge of offshore hybrid grids while developing essential calculation tools and models for planning, operating, and investing in hybrid offshore systems.

Hai Long

The Hai Long offshore wind farm has a production capacity of 1044 MW and is one of the first large scale offshore wind farms to be realized in Taiwan. Enersynt provided high-voltage engineering expertise throughout various stages of the project.

TwinHub

The TwinHub floating offshore wind farm, located approximately 16km off the coast of Hayle in Cornwall within the Wave Hub test site, represents a groundbreaking demonstration project.

Efficiency assessment transmission projects

Together with AFRY, Enersynt has been entrusted by the ACM with assessing TenneT's high voltage transmission projects to ascertain their adherence to various objectives and efficiency standards.

Luxembourg PV

Situated in the Luxembourg province, Wallonia, Belgium, the Diodi solar farm is a planned 40MW PV installation set to be connected to the Elia grid. Initially designed for 70kV operation, the connection will be upgraded to 110kV post-2030.

Stora Enso Solar PV

Equans has delivered a 1.4 MVA rooftop solar installation at Stora Enso’s Langerbrugge paper mill in Ghent. Enersynt performed the power system studies to secure compliance with Elia’s Type B grid code requirements for Power Park Modules (PPMs).
Featured Project
Solar PV
Transmission
R&D
Industry
HVDC
Battery
Wind
Hydrogen

Let’s start a new project together

We can tell stories about our past projects all day long but would love to hear about yours