We use third-party cookies in order to personalise your experience
Read our Cookie Policy.
Featured Project
Wind

Northwester 2

Client:
Parkwind
Location:
Belgium
Year:
2019 - 2021
Key project data
Rated power:
219 MW
Voltage:
220 kV
Contributors
Stijn Hendrix
Director & Senior Engineer

Introduction

The Northwester 2 Offshore Wind Farm is a renewable energy project located off the coast of Belgium in the North Sea. With a commitment to harnessing the vast potential of wind energy, the project aimed to contribute significantly to Belgium's renewable energy targets. Enersynt contributed to the experienced project team with an Electrical Expert to ensure the successful development, construction, and commissioning of the electrical infrastructure of Northwester 2.

Project Background

The Northwester 2 Offshore Wind Farm was developed by Parkwind, a leading offshore wind energy company dedicated to sustainable energy production. The project's objectives were ambitious, aiming to provide clean energy to approximately 220 000 households and reduce CO2 emissions by over 500 000 mT annually.

The wind farm is located in the North Sea, off the coast of Belgium. It is fitted with 23 of the largest commercially available wind turbines at the time, resulting in a total installed capacity of 219 MW. This marks a crucial step toward Belgium's renewable energy goals and a reduction in greenhouse gas emissions.

Submarine inter array cables interconnect the wind turbines at 33 kV and transfer the generated power to an offshore high voltage substation with a total topside weight of approximately 1 000 mT. Power collected by the offshore substation is transported by a 220 kV submarine export cable to the Modular Offshore Grid (MOG) developed by Belgium’s transmission system operator ELIA, approximately 40km from the Belgian coast in the North Sea.

Northwester 2 offshore substation on route to its final destination

Role as Electrical Expert

As Electrical Expert, part of Parkwind's project team, Enersynt's responsibilities encompassed various critical aspects of the project:

HV/MV and Auxiliary Systems Engineering Review
Our team meticulously assessed the engineering of the high voltage (HV) and medium voltage (MV) systems, as well as auxiliary systems for the offshore high voltage substation. This ensured the robustness and reliability of the electrical infrastructure.

Managing Substation Erection and Testing
In close collaboration with the project team, our engineer managed the erection and harbor acceptance testing of the high voltage offshore substation at the construction yard in Aalborg, Denmark. This phase required meticulous coordination to ensure the substation's compliance with stringent quality standards.

Offshore Commissioning and Energization
Enersynt's electrical expert oversaw the offshore commissioning and first energization of the 225 kV submarine export cable, 33 kV inter-array cables, and the offshore substation. This critical step marked the transition from construction to operation.

Grid Code Compliance Validation Testing
To ensure seamless integration into the grid of the Transmission System Operator Elia, our engineer conducted the grid code compliance validation testing of the wind farm and its power plant controller. Compliance with grid codes is vital for the stable and efficient operation of the wind farm and the electrical grid it is connected to.

Voltage Service Provider Ancillary Services
Our expertise extended to calculating the operational expenditures related to the "Voltage Service Provider" ancillary services. Enersynt also facilitated the technical integration of the ReVolt interface with Elia, further extending the wind farm's contribution to grid stability.

Conclusion

The Northwester 2 offshore wind farm stands as a testament to the potential of offshore wind energy in reducing carbon emissions and advancing renewable energy goals. Through our role as Electrical Expert, Enersynt contributed to the successful construction, commissioning and taking into service of the project's electrical infrastructure.

Projects

Case studies

Learn more about our services from a selection of our references
Hydrogen

Neptune H2opZee

The H2OpZee project represents a pioneering effort in offshore hydrogen technology, developed jointly by Neptune and RWE. The project envisages the offshore production of hydrogen fed by an offshore wind farm with a nominal capacity of 525 MW.
Wind

TwinHub

The TwinHub floating offshore wind farm, located approximately 16km off the coast of Hayle in Cornwall within the Wave Hub test site, represents a groundbreaking demonstration project.
R&D
HVDC

Cordoba

The CORDOBA research project aimed to deepen academic and industry understanding and knowledge of offshore hybrid grids while developing essential calculation tools and models for planning, operating, and investing in hybrid offshore systems.
Featured Project
Wind

Northwester 2

The Northwester 2 offshore wind farm is located in the North Sea, off the Belgian coast. The grid connection of the wind farm is realized through an offshore high voltage substation which is connected to Elia’s Offshore Switch Yard (OSY) to export the energy to shore.
Solar PV

Luxembourg PV

Situated in the Luxembourg province, Wallonia, Belgium, the Diodi solar farm is a planned 40MW PV installation set to be connected to the Elia grid. Initially designed for 70kV operation, the connection will be upgraded to 110kV post-2030.
Transmission

Efficiency assessment transmission projects

Together with AFRY, Enersynt has been entrusted by the ACM with assessing TenneT's high voltage transmission projects to ascertain their adherence to various objectives and efficiency standards.
Wind

Hai Long

The Hai Long offshore wind farm has a production capacity of 1044 MW and is one of the first large scale offshore wind farms to be realized in Taiwan. Enersynt provided high-voltage engineering expertise throughout various stages of the project.
Battery

Deux-Acren

Corsica Sole has developed a 50MW/100MWh battery energy storage system (BESS) in Belgium. Enersynt was entrusted with ensuring compliance with the Elia Type C grid code requirements for Storage Park Modules (SPMs).
Hydrogen

Hyoffwind

Hyoffwind is set to become a 37 MVA hydrogen production facility situated in the port of Zeebrugge. Enersynt, acting as the lead electrical engineer on behalf of the developer, contributed to bringing this innovative project to the next stages of development.

Let’s start a new project together

We can tell stories about our past projects all day long but would love to hear about yours