We use third-party cookies in order to personalise your experience
Read our Cookie Policy.
Transmission

Efficiency assessment transmission projects

Client:
AFRY
Location:
Netherlands
Year:
2023 - present
Key project data
Rated power:
> 2 GW
Voltage:
110 - 380 kV
Contributors
Paul van Leest
Co-Founder & Senior Engineer

Introduction

As the overseer of taxpayer funds, the Dutch regulator ACM plays a critical role in ensuring the proper allocation of resources, such as in the transmission grid projects managed by the Dutch Transmission System Operator (TSO), TenneT. Under a framework agreement, AFRY (formerly BLIX) has been entrusted with assessing TenneT's projects to ascertain their adherence to various objectives and efficiency standards. Enersynt has been engaged to contribute expertise in various aspects of these assessments.

The projects to be assessed consisted of various onshore and offshore transmission expansion projects, such as the Marnezijl - Oudehaske grid reinforcement and the Hollandse Kust Zuid onshore and offshore grid development.

Project Background

Our assessment initiative is rooted in a meticulous exploration of the projects overseen by TenneT, the Dutch Transmission System Operator. At its core, our inquiry focuses on fundamental questions regarding the attainment of project objectives. We rigorously evaluate whether planned grid transmission capacities have not only been reached but also sustained for electricity transmission, ensuring the fulfillment of project goals.

Furthermore, our evaluation encompasses a thorough analysis of the financial aspects of TenneT's projects, including an examination of the alignment between the initial investment budget and subsequent revisions, aiming to understand any disparities and assess financial prudence in project planning and execution. Additionally, we scrutinize project costs to ensure they align with objectives and deliverables, identifying avoidable expenses and optimization opportunities to enhance resource efficiency while maintaining project quality.

In parallel, we investigate TenneT's adherence to formal procurement procedures, evaluating the organization's commitment to transparency, fairness, and regulatory compliance in its procurement practices. This aspect of our evaluation ensures the integrity and legality of the procurement process, mitigating risks associated with non-compliance.

Lastly, we delve into the effectiveness of TenneT's risk management strategies, aiming to identify, mitigate, and manage project risks comprehensively. By analyzing risk management practices, we seek to ensure project resilience and continuity in the face of potential disruptions.

In summary, together with our client AFRY, our multifaceted inquiry into TenneT's projects encompasses key aspects such as objective attainment, budget alignment, procurement compliance, risk management effectiveness, and cost optimization. Through this comprehensive evaluation, we aim to provide insights that enhance project efficiency, accountability, and adherence to best practices.

Role of Enersynt

Enersynt has played a pivotal role in addressing specific research questions within various projects, leveraging its expertise in design, budgeting, and project execution. Enersynt's contributions have primarily focused on research questions concerning objective achievement, cost efficiency, and additional work assessment.

Conclusion

While the framework assessment is ongoing, TenneT has demonstrated a commitment to robust procedures and practices across multiple projects. This commitment underscores TenneT's dedication to accountability and efficiency in infrastructure development.

Projects

Case studies

Learn more about our services from a selection of our references
Hydrogen

Hyoffwind

Hyoffwind is set to become a 37 MVA hydrogen production facility situated in the port of Zeebrugge. Enersynt, acting as the lead electrical engineer on behalf of the developer, contributed to bringing this innovative project to the next stages of development.
Wind

Hai Long

The Hai Long offshore wind farm has a production capacity of 1044 MW and is one of the first large scale offshore wind farms to be realized in Taiwan. Enersynt provided high-voltage engineering expertise throughout various stages of the project.
Transmission

Efficiency assessment transmission projects

Together with AFRY, Enersynt has been entrusted by the ACM with assessing TenneT's high voltage transmission projects to ascertain their adherence to various objectives and efficiency standards.
Battery

Deux-Acren

Corsica Sole has developed a 50MW/100MWh battery energy storage system (BESS) in Belgium. Enersynt was entrusted with ensuring compliance with the Elia Type C grid code requirements for Storage Park Modules (SPMs).
Solar PV

Luxembourg PV

Situated in the Luxembourg province, Wallonia, Belgium, the Diodi solar farm is a planned 40MW PV installation set to be connected to the Elia grid. Initially designed for 70kV operation, the connection will be upgraded to 110kV post-2030.
Hydrogen

Neptune H2opZee

The H2OpZee project represents a pioneering effort in offshore hydrogen technology, developed jointly by Neptune and RWE. The project envisages the offshore production of hydrogen fed by an offshore wind farm with a nominal capacity of 525 MW.
Featured Project
Wind

Northwester 2

The Northwester 2 offshore wind farm is located in the North Sea, off the Belgian coast. The grid connection of the wind farm is realized through an offshore high voltage substation which is connected to Elia’s Offshore Switch Yard (OSY) to export the energy to shore.
R&D
HVDC

Cordoba

The CORDOBA research project aimed to deepen academic and industry understanding and knowledge of offshore hybrid grids while developing essential calculation tools and models for planning, operating, and investing in hybrid offshore systems.
Wind

TwinHub

The TwinHub floating offshore wind farm, located approximately 16km off the coast of Hayle in Cornwall within the Wave Hub test site, represents a groundbreaking demonstration project.

Let’s start a new project together

We can tell stories about our past projects all day long but would love to hear about yours